top of page

Second Story Addition: Architect Fees and Cost Estimates

  • Writer: Barry Shaw
    Barry Shaw
  • Aug 15
  • 2 min read

Updated: 4 days ago

Second Story Addition in Boulder, Colorado

šŸ” Second Story Addition vs. New Home: Architect Fees & Cost Insights

We recently consulted with a homeowner in Boulder County seeking guidance on architect consulting fees—specifically for a Second Story AdditionĀ compared to building a new custom home. To help them evaluate the best approach, we provided a detailed breakdown of estimated fees, design requirements, and projected construction timelines based on overall livable square footage.


šŸ“ Scope of Work & Fee Comparison

Every residential project is unique, but for the sake of comparison, we based our analysis on an ā€œaverageā€ quality level of home materials. Note: fees for additional consulting engineering services—such as Civil, Soils, Structural, Energy, HVAC, Electrical, or Plumbing—are not included in the base architectural fee estimates.


šŸ  New Custom Home (3,000 sq. ft.)
  • Requires full set of architectural plans (approx. 20 sheets at 36ā€x24ā€)

  • Estimated Architect Fee: $85,000–$110,000

  • Plan development timeline: 6–7 months

  • Add additional time for City/County review and approvals


šŸ—ļø Pop-Top / Second Story Addition (1,500 sq. ft.)
  • Second Story Addition on top of an existing 1,500 sq. ft. home

  • Includes major remodel of the first floor

  • Requires approximately 12 sheets of plans

  • Estimated Architect Fee: $50,000–$65,000

  • Plan development timeline: 4–5 months


As you can see, a Second Story AdditionĀ offers a substantial savings in both time and architect fees compared to a new custom build. It’s an excellent option for homeowners looking to expand their space without relocating or starting from scratch.


šŸ› ļø Additional Consulting Services

If you're planning a Second Story Addition, we can provide a range of architectural consulting services to support your decision-making, including:

  • Schematic architectural design plans

  • Site and land improvement considerations

  • Zoning and code compliance analysis

  • Assessment of existing building conditions

  • Preliminary construction cost estimates


We’re here to help guide your home transformation, whether it's a new build or a strategic Second Story Addition.


Best Always,

Barry R. Shaw, AIA, GC

Comments


bottom of page