top of page



How Clients Influence Construction Change Order Costs
Additional costs are never comfortable, but should be anticipated and accounted for, with a contingency fund Sticking to building the approved architectural plans, with little change during construction, will not only assist greatly with controlling change order costs, but lead to a more timely schedule as well. When changes are made in the field, a multitude of trades will be involved with associated additional costs. For instance, relocating one load-bearing wall could like

Barry Shaw
May 31, 2013


Controlling Home Building Costs Before Construction Begins
One of the biggest considerations in building a home in today’s economy is controlling home building costs. Building a home involves many processes, but perhaps the most important factors are pre-construction architectural design and planning because these are important factors in controlling home building costs. Typically the architect is responsible for the designs, specifications, engineering and permit processing, with a multitude of choices and decisions along the way. T

Barry Shaw
May 31, 2013
bottom of page
